THE EDITOR, Madam:

The Ministry of Science, Energy and Technology (MSET), is mindful of comments expressed in the editorial ‘Urgency in electricity review’, published in The Gleaner on July 26.

The ministry, therefore, wishes to reiterate its position concerning the Joint Select Committee (JSC) reviewing the Electricity Act, 2015; in a bid to clarify misconceptions in the public domain.

The MSET wishes to place on record that any claim that states that the JSC reviewing the Electricity Act, 2015 is ‘suspended’ or ‘delayed’, is erroneous, inaccurate and misleading.

As noted by the Minister of Science, Energy and Technology, Daryl Vaz, to JSC committee members, the committee, based on its timetable, would have its last meeting on July 6. The committee would then reconvene in September 2022, as per its schedule.

In anticipation of the September 2022 resumption of the sitting of the committee, the minister and chairman noted that the ministry would finalise the establishment of a high-level multistakeholder team; whose duty it is to review and, where necessary, update the data guiding the deliberations of the JSC.

This is in a bid to ensure that the electricity sector is not placed at a disadvantage, owing to decisions based on data that are not reflective of current global trends. Recall that the data currently guiding the JSC deliberations are based on pre-COVID-19 and pre-Ukraine war trends.

Additionally, the team will explore key areas to facilitate the provision of strategic policy recommendations to the Cabinet, regarding the evolving state of affairs in the local electricity sector. These areas include: increasing grid defection of large demand consumers, increases in non-technical losses (i.e. theft), increases in generation procurement within the ambit of a declining demand trend, and the desire by some stakeholders to have the electricity sector unbundled within the current electricity sector review cycle, and its long-term implications.

As it pertains to the progress the ministry has made with the establishment of the high-level team, the ministry is pleased to inform that a 12-member team has been operationalised. It comprises various energy stakeholders (some of whom already form a part of the JSC) and multilateral partners.

In closing, the ministry wishes to reiterate its position that it aims to conduct the strategic review of the Electricity Act, 2015 thoroughly; to ensure the mistakes of the past are not repeated, and that the resulting Act is sufficient in its ability to incorporate current trends and the future distributed energy landscape.

MINISTRY OF SCIENCE, ENERGY AND TECHNOLOGY